16 – Configuring Schedules
358 R400
About the Schedules Option
The Schedules option enables the control of points to be scheduled on both a
one-off and periodic basis. For example, a pump could be scheduled to be
switched on at 4 pm and off at 6 pm each day.
Schedules are configured using Station displays. The following attributes can be
configured for each schedule:
The time and date of the point control
The point and point parameter to be controlled
The value to control the point parameter to
The schedule action
The schedule action can be one-shot, daily, work day, weekend, holiday, or a
day of the week.
The number of schedules that can be configured is based on database sizing (see
the Installation Guide for details.)
Configuration information that is related to the scheduling option is the
configuration of holidays and shifts. Holiday and Shift configuration displays are
part of a standard PlantScape system and are described in the following topics.